The future of the East Bank Demerara highway at Craig, where the Demerara River is undercutting sections of the road, will be determined when a feasibility study for the proposed four-lane highway is completed.
The authorities, meanwhile, are considering whether to invest any more money to protect the area from the destabilizing waters. In addition, the future of dwellings in the problematic area will be reviewed.
Minister of Transport and Hydraulics, Robeson Benn,