By the end of the year, two new generators should be installed at Lethem to boost the power supply in the growing border township and a new facility will be constructed to replace the current flood-prone Lethem Power Company office.
The new generators along with the three currently in Lethem will be able to produce over two megawatts of power – way above the current consumption of half megawatt of electricity by the town,