Residents say the ‘A’ Field, Sophia access road, which has been left incomplete after reconstruction began a month ago, is a hazard.
According to residents, only a section of the road was completed and since then there has been no indication of a plan to resume works. The road was reconstructed from the head and stopped at the third corner that