Liza Destiny, which will be the first oil production vessel to be located in Guyana’s waters has left Singapore, according to a release yesterday from ExxonMobil.
Christened on June 22, 2019 by First Lady Sandra Granger, the Floating, Production, Storage and Offloading (FPSO) vessel is expected in Guyana’s waters in September as the country readies for first oil in 2020.
The Liza Destiny has a production capacity up to 120,000 barrels of oil per day and an overall storage volume of 1.6 million barrels.