Click here to print.
Liza Destiny reception
By
Stabroek News
On
September 10, 2019 @ 2:01 am
In Photos |
Last evening, ExxonMobil in collaboration with Minister of State Dawn Hastings-Williams held a reception at the Marriott Hotel to commemorate the arrival of Guyana’s first Floating, Production, Storage and Offloading (FPSO) vessel, the Liza Destiny. The vessel has a production capacity up to 120,000 barrels of oil per day and an overall storage volume of 1.6 million barrels. Dancers added flair to the reception.
Last evening, ExxonMobil in collaboration with Minister of State Dawn Hastings-Williams held a reception at the Marriott Hotel to commemorate the arrival of Guyana’s first Floating, Production, Storage and Offloading (FPSO) vessel, the Liza Destiny. The vessel has a production capacity up to 120,000 barrels of oil per day and an overall storage volume of 1.6 million barrels. Dancers added flair to the reception.