Power ship briefing

Power ship briefing: Prime Minister Mark Phillips (second from left) being briefed yesterday aboard the Turkish power ship on its operations. The ship moored at Everton on the Berbice River on Sunday and it is supposed to be connected to the grid to begin providing 36 megawatts of power by tomorrow. It was one of the relief measures taken by the government to cover a shortfall in generation. (Guyana Power and Light photo)
Power ship briefing: Prime Minister Mark Phillips (second from left) being briefed yesterday aboard the Turkish power ship on its operations. The ship moored at Everton on the Berbice River on Sunday and it is supposed to be connected to the grid to begin providing 36 megawatts of power by tomorrow. It was one of the relief measures taken by the government to cover a shortfall in generation. (Guyana Power and Light photo)