Interconnection:

Paving has begun on the four-lane interconnection (Red Road) between the East Bank Public Road and Heroes Highway. (Office of the President photo).
Paving has begun on the four-lane interconnection (Red Road) between the East Bank Public Road and Heroes Highway. (Office of the President photo).